Case studies

They trust us

Hospitals:

Haematology

ESTAING UNIVERSITY HOSPITAL, CLERMONT-FERRAND, Haematology ward

GHICL in LILLE, St Vincent de Paul Hospital, Oncology Haematology

ICL Loire Cancer Centre, SAINT-ETIENNE UNIVERSITY HOSPITAL, Sterile area haematology ward

 

Operating theatres

SAINT GATIEN GROUP – Fontainebleau and Tournan en Brie clinics, Operating theatres (orthopaedics)

AP-HP – GEORGES POMPIDOU HOSPITAL, KREMLIN BICETRE, Interventional radiology, Orthopaedics, etc.

CLINIQUE DE MONTARGISOrthopaedics

 

Paediatric/Adult life-support

LILLE REGIONAL AND UNIVERSITY HOSPITAL, Jeanne de Flandre Hospital, Neonatal life-support

LA ROCHELLE HOSPITAL GROUP, Life-support

AP-HP – LARIBOISIERE HOSPITALAdult life-support, etc.

Anatomical pathology laboratories / Clinical Research Units

CAEN UNIVERSITY HOSPITAL, Anatomical pathology laboratory

MOULINS-YZEURE HOSPITAL, MOULINS, Cytostatic reconstitution unit, etc.

 

 

Industry and other:

SANOFI

SORBONNE UNIVERSITE

Our Healthcare sector references

ESTAING  HOSPITAL– CLERMONT-FERRAND

Permanent installation

PURPOSE:

Total refurbishment, ventilation and air handling for 5 rooms in the adult haematology ward (Level 2, Building 2).

AIM:

  • Achieve an air change rate of 6 vol/h in the 5 rooms;
  • Supply air via an absolute filtration stage (H14);
  • Achieve a 5-log bacteria reduction upstream of the terminal filtration;
  • Eliminate at least 70% of chemical pollutants, in particular organic pollutants specific to the activity in the ward;
  • Maintain a setpoint temperature of 20°C.

PROPOSED SOLUTION:

Installation Installation of an R4000 permanent air handling unit,
Cooling by a chilled water cooling battery, installation of supply, extraction and new air networks. Plenum connection kit for distribution of air in the 5 rooms,
Acoustic treatment.


 

NB:

The proposed solution enables ISO 7 clean room classification to be achieved if the establishment so wishes. The R4000 unit only uses an air-flow of 1350 m3/h.

 YVES LE FOLL HOSPITAL
 – SAINT-BRIEUC

Mobile installation

PURPOSE:

An R4000 mobile air handling unit (Aspergillus decontamination in a haematology-oncology room)

AIM:

  • ISO 7 with regard to particles,
  • M1 fungal classification in the presence of people,
  • No overpressure.

PROPOSED SOLUTION:

Installation of an R4000 mobile air handling unit.

AT THE PLANNING STAGE:

Creation of ISO 7 rooms with overpressure and temperature treatment, connection of a new R4000 unit in a common airlock which will supply two diffuser ceilings (during 2017, pre-costing estimate of < €70K excluding VAT, air handling supply and installation).

HOSPITAL CHARLEVILLE-MEZIERES

Mobile installation

PURPOSE:

Additional air handling in the operating theatre (orthopaedics)

AIM:

  • ISO 5

PROPOSED SOLUTION:

Installation of an R4000 mobile air handling unit in the operating theatre.

HOSPITAL – MOULINS-YZEURE

Mobile installation

PURPOSE:

Control recurring Aspergillus contamination in the cytostatic reconstitution unit.

AIM:

  • Absence of Aspergillus in the Clinical Research Unit environment.

PROPOSED SOLUTION:

Deployment of an R4000 mobile unit in the CRU.

FLOREAL MEDICAL AND SURGICAL CENTER – BAGNOLET

Permanent installations

PURPOSE:

Refurbishment of 2 operating theatres.

AIM:

  • ISO 5

PROPOSED SOLUTION:

Installation of one permanent air handling unit per operating theatre. The R4000 units are placed outside the theatres and connected:

  • to the supply: to a supply strip in the theatre,
  • to the return: to a mixing plenum with new air inlet (for overpressurisation) and return in the theatre (for recycling) + temperature management (cooling battery and electric battery).
POLYCLINIQUE DE LA FORÊT – FONTAINEBLEAU

Mobile installation

PURPOSE:

Additional air handling in the operating theatre.

AIM:

  •  ISO 5

PROPOSED SOLUTION:

Installation of an R4000 mobile air handling unit in the operating theatre, achievement of ISO 5 classification.

CLINIQUE – MONTARGIS

Permanent installation – operating theatre

PURPOSE:

Design of air handling for the operating theatre

AIM:

  • Class 4 risk zone
  • ISO 5, M1
  • Improvement of the acoustics and turbulence in another operating theatre (ISO 5)

PROPOSED SOLUTION:

Installation of an AHU equipped with non-thermal catalysis in the orthopaedic operating theatre, overpressure and temperature management.

CLINIC – MONTARGIS
Mobile installation – Salle de stérilisation

PURPOSE:

Improve the air quality.

AIM:

  • ISO 7

PROPOSED SOLUTION:

Installation of an R4000 mobile air handling unit. 

HOSPITAL – ABBEVILLE

Mobiles installations

PURPOSE:

Control recurring Aspergillus contamination in the care unit

AIM:

  • Absence of Aspergillus throughout the sensitive part of the ward.

PROPOSED SOLUTION:

 Deployment of two R4000 mobile units at both ends of the ward corridor, destroying all the Aspergillus spores and maintaining this level at all times during activity

BERGOUIGNAN CLINIC – EVREUX

Trial prior to permanent installation

PURPOSE:

Additional air handling in the operating theatre while awaiting a permanent installation

AIM:

  • ISO 5

PROPOSED SOLUTION:

Deployment of an R4000 mobile unit in an operating theatre.

AT THE PLANNING STAGE:

Work begun in week 34.
Refurbishment of 3 operating theatres to ISO5 with overpressurisation and temperature treatment.
Installation of 3 R4000 units at the end of August 2016.